The material of main frame such as beams and columns used Q235B steel to support stability ,and only the walls on the first floor used brick for cover while the rest exterior cover using corrugated steel and EPS sandwich panels.
The material of main frame such as beams and columns used Q235B steel to support stability ,and only the walls on the first floor used brick for cover while the rest exterior cover using corrugated steel and EPS sandwich panels.
Our client ,Frank , was a project contractor whose business experience of project construction was really rich. rank needed one-stop service with reasonable price and good quality.
To make sure that the plant might be have long life span ,we suggest our client using galvanized steel as core frame material.
A steel structure project of water factory was sized about 6000 square meter in a dimension of 100m * 60m *7m .Switch to ft , it’s almost 20,000 square ft . Even though the contract had been signed ,the plan of this project was not resolved.Such behavior was against the interest of us but we still found a way to reconcile the problem .The foundation of Senegal project had been placed in local earlier before we signed the contract ,and it had to be reset to fix the new plan since the foundation have changed to a new one after signing the contract .
EPS woulb be the ideal material for Ben's project ,because the EPS has feature of antimosquito and waterproofing ,showing highly adaptive in those whose climate is tropical climate like Malaysia.
During the installation time your installation team work with us and met the sand storm, rainstorm, your workers also have stomachache during the work...
Thank you offer us installation instruction guidance to set up our workers dormitory fast and smooth. Help us save the time and money.we also satisfaction your quality.
Thank you Bing Cheng offer us best service and better payment terms by monthly. We are trust your team and will place more orders to your factory by continuous.
The life services of our modular house should be more than 15 years at least. The demand of the live load capacity of floors should be heighten ,because the house would be used as a accommodation for employee of care center ,where is located right in front of the the modular house ,and luggage moving would be a high frequency activity that needs our engineers to consider it as a vital problem .
Feature:3 storeys ,saved lots of cost that were supposed to spend on paying long duration and high labor wage.
Thank you send the goods to us so fast, we are satisfaction your quality and best service.
Benjamin, who had taken over time to seek a manufacturer that could indicate them finish their project,now desperately needed a solution .In preceding months ,he had been rejected by over 5 steel frame manufacturers who were not competent enough .
We are according the installation guidance is easy to assemble the project. We are very satisfaction our house. Thank you for your team hard worked, help us save the time and money.
Case 3: project located Chile
Size: 10m x 6m x 3m
Application: A house owned by a citizen
Get order time: June, 2015
Finished time: August, 2015